Status Report - GREEN
detailed report see below
detailed report see below
Project Description
The Digital Clock project requires the design, testing, calculating, and production of a digital clock. This hardware-based clock will be designed by using a 60Hz clock pulse, a 1kHz clock pulse, decoders, counters, multiplexers, frequency dividers, buffers, and lastly 7-Segment displays. The outcome of meeting all the requirements; using correct methods, doing the appropriate calculations, and thoroughly recording and documenting test results, will result in a fully functional digital clock.
The 60Hz clock signal will be used as the main timing signal to provide pulses for the seconds, which will then counted and stored in memory registers and then displayed on the 7-segment displays through multiplexers. The display is controlled by the 1kHz clock signal. This is done by using it to controlled a MOD-4 counter which synchronizes the multiplexer and the decoder.
The resultant digital clock well have 2 digits assigned to hours (24 hours), and 2 digits assigned to minutes (60 minutes), and a flashing LED to represent the seconds.
The 60Hz clock signal will be used as the main timing signal to provide pulses for the seconds, which will then counted and stored in memory registers and then displayed on the 7-segment displays through multiplexers. The display is controlled by the 1kHz clock signal. This is done by using it to controlled a MOD-4 counter which synchronizes the multiplexer and the decoder.
The resultant digital clock well have 2 digits assigned to hours (24 hours), and 2 digits assigned to minutes (60 minutes), and a flashing LED to represent the seconds.
status report color code
Green - Everything is working well and is on time. This part of the project is ready to be continued.
Yellow - Some aspects are working and some are not. May be a little behind schedule, some work is needed.
Red - Things are not working out how they should at all. Behind schedule and action should be taken immediately.
Yellow - Some aspects are working and some are not. May be a little behind schedule, some work is needed.
Red - Things are not working out how they should at all. Behind schedule and action should be taken immediately.
Week 1 Status Report and WBS
Week 2 Status Report and WBS
Week 3 Status Report and WBS
Week 4 Status Report and WBS
Week 2 Status Report and WBS
Week 3 Status Report and WBS
Week 4 Status Report and WBS
Completed on January 31st, 2013